- Allow creation of point of origin load data
- Disaster
- Project Worksheet
- Disposal / Reduction Location
- Monitor Company
- Client Employee (Optional)
- State Inspector (Optional)
- Federal Inspector (Optional)
- Work Order
- Loading Zone
- Capture date and time and other relevant point of origin data
- Designate debris type
- Write point of origin load data using encrypted storage algorithms
- Associate ticket/tower personnel credentials with point of origin load data
- Acknowledge successful card write via display status message
- Provide user configurable time option for GPS audit
- Detect current location using GPS and store data to secure memory location
- Provide capability to add digital image if debris is other than vegetative or C&D