Right-of-Way Debris Management

  • Allow creation of point of origin load data
    • Disaster
    • Project Worksheet
    • Disposal / Reduction Location
    • Monitor Company
    • Client Employee (Optional)
    • State Inspector (Optional)
    • Federal Inspector (Optional)
    • Work Order
    • Loading Zone
  • Capture date and time and other relevant point of origin data
  • Designate debris type
  • Write point of origin load data using encrypted storage algorithms
  • Associate ticket/tower personnel credentials with point of origin load data
  • Acknowledge successful card write via display status message
  • Provide user configurable time option for GPS audit
  • Detect current location using GPS and store data to secure memory location
  • Provide capability to add digital image if debris is other than vegetative or C&D